SERVICES
1. SECURING A BUILDING PERMIT
A building permit is required prior to construction, erection, alteration, major repair, or renovation or conversion of any building/structure owned by government or private entities.
The permit becomes null and void if work does not commence within 1 year from the date of such permit, or if the building or work is suspended or abandoned at any time after it has been commenced for a period of 120 days.
FEES ( based on National Building Code)
A. Residential
|
Area is Square Meter
|
Fee Per Sq. Meter
|
|
Original Complete Construction up to twenty (20) sq. meters
|
P 2.00
|
|
Additional /renovation/alteration up to twenty (20) sq. meters regardless of floor area of original construction
|
P 2.40
|
|
Above twenty (20) sq. meters to 50 sq. meters
|
P 3.40
|
|
Above 50 sq. meters to 100 sq meters
|
P 4.80
|
|
Above 100 sq. meters to 150 sq. meters
|
P 6.00
|
|
Above 150 sq. meters
|
P 7.20
|
B. Commercial
|
Area is Square Meter
|
Fee Per Sq. Meter
|
|
One (1) sq. meter to 20 sq. meters
|
P 3.00
|
|
Additional /renovation/alteration up to twenty (20) sq. meters regardless of floor area of original construction
|
P 3.40
|
|
Above twenty (20) sq. meters to 50 sq. meters
|
P 5.20
|
|
Above 50 sq. meters to 100 sq meters
|
P 8.00
|
|
Above 100 sq. meters to 150 sq. meters
|
P 8.40
|
REQUIREMENTS
1. 4 photo copies of Land Title or Tax Declaration of the land where building is to be constructed. 2. Tax clearance of land. 3. If the building permit is not the owner of the land appearing on the Land Title or Tax Declaration, 3 copies of affidavit of consent or Deed of absolute sale or Deed of extra judicial settlement is needed. 4. A.) For building above 20 sq.m. in floor area: 5 copies of plan specification and bill of materials duly signed by an Architect or Civil Engineer, Master Plumber and Professional Electrical Engineer, B.) For building of 20 sq.m. and below: 5 copies of sketch plan are needed with 5 copies of electrical sketch plan duly signed by a Professional Electrical Engineer. 5. Zoning Clearance and Fire Hazard. 6. One (1) long brown envelop.
• Housing and Land Use Regulatory Board – for zoning and land use of all types of building/structure • Bureau of Fire Protection – for all types of building/structure • Environment and Natural Resources Office/Department of Environment and Natural Resources – for all commercial and industrial buildings • Department of Labor and Employment – for industrial buildings • Department of Health – for health hazard related building/structure • Air Transportation Office – for building/structure exceeding 45.0 meters in height • Philippine Tourism Authority – for tourist oriented project • Department of Education Culture and Sports – for educational buildings • Energy Regulatory Board – for gas stations
NOTES:
The number of copies indicated above already includes the requirement for securing a Zoning Clearance (from the Municipal Planning and Development Office) and a Fire Clearance(Municipal Fire Coordinator).
For commercial and industrial buildings, provide 1 set of building plans and documents for submission to the Environment and Natural Resource Office.
For industrial buildings, provide additional 4 copies of electrical and mechanical plan, specifications and bill of materials and cost estimates for submission to the Department of Labor and Employment.
If all the clearances have been secured, the rest of the other documents indicated above are required to be submitted to the office of the building official: • 4 sets Building Plans • 3 copies Specifications • 3 copies Bill of materials and cost estimates • 3 copies Lot Documents
To facilitate processing, please take note of the following before submitting the plans and other requirements above to the Municipal Engineering Office:
• Requirements of the National Building Code • Requirements of the Referral Codes (Architectural Code, Philippine Electrical Code [PEC], Revised Plumbing Code, Structural Code [NSCP], Mechanical Engineering Code [PSME]) • Compliance with BP 344 (Accessibility Law) shall be indicated in detail on plans for commercial, institutional and public buildings • If setback/yard requirements are not met on the sides and at the back/rear then a Firewall (strictly no opening) extending up to at least 1 meter from the roof level shall be provided. It shall be indicated on the site development plan with owner’s conformity. • Grease Traps/Oil Separator shall be provided for hotels, restaurants, eateries, terminals, gasoline stations, auto repair shops, bakeries and other similar establishments. • All revisions/additions made in the plans shall have an acknowledgement of the designer. • Special Power of Attorney shall be provided if the owner is not the signatory in all application forms, plans and documents. • All application forms and letters must be properly filled-up with all the necessary information available. • Forms and letters, Plans, Specifications, Bill of Materials and Cost Estimates and other pertinent documents must be signed and sealed by the designer and signed by the owner
HOW TO AVAIL THE SERVICE
|
Follow these steps
|
It will take
|
Please Approach
|
|
Secure Building Permit Application Form
Client asks for building permit application form
ME provide technical assistance in accomplishing the form
|
20 minutes
|
Engr. RODERIC R. BOMEDIANO Engineer I
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Submit Requirements
Client submits the plans and supporting documents
ME review the plans and supporting documents
|
15 minutes
|
ALEXANDER P. DOLAUTA
Mun Engineer
|
|
Line and Grade Verification
Technical staff in-charge will conduct site inspection to establish and determine setbacks and grades in relation to road lots, property lines, street or highways whether existing or proposed, including road widening and construction of various public utilities and other infrastructure project.
|
2 hours
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Evaluation and Assessment
Municipal engineer evaluates and assesses Line and Grade, Structural Plans and related documents,
|
60 minutes
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Inquiry of the Status of Application
Client inquires about the result of evaluation and assessment of his application
ME gives list of lacking documents
|
10 minutes
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Issuance of Order of Payment
Client receives the Order of Payment if the application is found to be complete and in order and pay to treasure’s office
|
10 minutes
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
Beda Legaspi Revenue Collection Clerk I1
Rufa acuñA Revenue Collection Clerk II
|
|
Submit Official Receipt
Client submits the official receipt to the Municipal Engineer
|
5 minutes
|
Engr. ALEXANDER P. DOLAUTA
Municipal Engineer
|
|
Processing of Permits
ME Staff processes the plans and pertinent documents for final approval of the building official.
|
½ day
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Approval of Permit
Municipal Engineer approves the building permit.
|
10 minutes
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Release of Permit
Client receives the approved permit
|
3 minutes
|
Engr. ALEXANDER P. DOLAUTA Municipal Engineer
|
2. SECURING AN OCCUPANCY PERMIT
An Occupancy permit is required before any building or structure is used or occupied. It is usually secured after the completion of a structure.
It is also required if there is any change in the existing use or occupancy classification of a building, structure or any portion thereof.
FEES ( Based National Building Code)
a. Residential
Costing up to P 150,000.00 |
P 100.00
|
|
Costing more than P 150,000 up to P400,000
|
P 200.00
|
|
Costing more than P 400,000 up to P850,000
|
P 400.00
|
|
Costing more than P 850,000 up to P1,200,000
|
P 800.00
|
|
Every million or portion thereof if excess of P1,2000.00
|
P 800.00
|
b. Commercial
Costing up to P 150,000.00 |
P 200.00
|
|
Costing more than P 150,000 up to P400,000
|
P 400.00
|
|
Costing more than P 400,000 up to P850,000
|
P 800.00
|
|
Costing more than P 850,000 up to P1,200,000
|
P 1,000.00
|
|
Every million or portion thereof if excess of P1,2000.00
|
P 1,000.00
|
C. Institutional
Costing up to P 150,000.00 |
P 150.00
|
|
Costing more than P 150,000 up to P400,000
|
P 250.00
|
|
Costing more than P 400,000 up to P850,000
|
P 600.00
|
|
Costing more than P 850,000 up to P1,200,000
|
P 900.00
|
|
Every million or portion thereof if excess of P1,2000.00
|
P 900.00
|
REQUIREMENTS
-
- Certificate of Completion from the Building Official
- Certificate of Completion - Mechanical, Electrical and Sanitary/Plumbing Permits
- Logbook of building construction and Building Inspection Sheet duly accomplished by the contractor (if undertaken by contract) and signed and sealed by the architect or civil engineer.
- Certificate of Final Electrical Inspection
- Final Fire Safety Inspection Report by the Bureau of Fire Protection
HOW TO AVAIL THE SERVICE
|
Follow these steps
|
It will take
|
Please Approach
|
|
Submit Requirements
Submit the duly accomplished application form and documents
|
5 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Evaluation and Assessment
The ME evaluates and assesses the submitted plans and pertinent documents for compliance with the requirements of the building code, referral codes, laws and ordinances.
|
15 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Order of Payment
If the documents are in order, the client receives an Order of Payment stating the fees to be paid.
|
10 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Payment of Fees
Client pays to the Municipal Treasurer’s Office the corresponding fees
|
5 minutes
|
Beda Legaspi Revenue Collection Clerk II
Rufa Acuña Revenue Collection Clerk II
|
|
Submit Official Receipt
Client submits the official receipt to the ME
|
5 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Processing of Permit
ME staff processes the plans and pertinent documents for final approval of the building official.
|
1 day
|
RODERIC R BOMEDIANO Engineer I
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Release of Permit
Client receives the approved permit.
|
10 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
3. SECURING OTHER BUILDING-RELATED PERMITS
Aside from the building permit, the Office of the Municipal Engineer, issues other permits that are required before the renovation, construction or demolition of any structure.
FEES ( Based on National Building Code)
A. ELECTRICAL
|
|
Fee Per Sq. Meter
|
|
Each switch , lighting, convenience outlet
|
P 1.50
|
|
Each special purpose and outlet of 20 amp.cap or more
|
P 3.00
|
B. FENCING
|
|
Fee Per Sq. Meter
|
|
Made of masonry, metal, concrete up to 1.8 m in height per lineal meter
|
P 3.00
|
|
Excess of 1.80 m height per lineal meter
|
P 4.00
|
|
Made of indigenous materials barbed chicken or hogwires per lineal meter
|
P 2.40
|
C. PLUMBING FEES
|
|
Fee Per Sq. Meter
|
|
Installation fee, one (1) unit composed of one(1) water closet two (2) floor drains one (1) lavatory one(1) sink with ordinary trap, three (3) faucets and one (1) shower head. A partial part thereof shall be charged as that of cost of wire unit
|
P 24.00
|
|
Every Fixtures in excess of one (1) unit:
- Water closet ………………………………………………….
- Floor drain …………………………………………………….
- Sink …………………………………………………………….
- Lavatory ………………………………………………………
- Faucet …………………………………………………………
- Shower Head …………………………………………………
- Bath Tub ………………………………………………………..
|
P 7.00 P 3.00 P 3.00 P 7.00 P 2.00 P 2.00 P 7.00
|
|
Water meter
|
P 2.00
|
|
12 up to 25 mm diameter
|
P 8.00
|
|
Construction of septic vault up to 5 cu m digestion chamber
|
P 10.00
|
|
Every cu. M fraction thereof in excess of five cu. meter
|
P 7.00
|
D. GROUND PREPARATION PERMIT
|
|
Fee Per Sq. Meter
|
|
Ground Preparation (GP) and excavation fee inspection and verification fee
|
P 200.00
|
|
Per cubic meter excavation
|
P 3.00
|
|
Issuance of GP and EP Valid for thirty days
|
P 50.00
|
REQUIREMENTS ( Based on National Building Code )
ELECTRICAL PERMIT
This document is required before putting up new or additional, or alteration of electrical installations involving at least 20 outlets or a capacity of 4 Kilowatts. For new buildings, this forms part of the requirements for a Building Permit application.
Requirements:
- Electrical Permit Application Form signed by a professional Electrical Engineer.
- Electrical Plans
- Electrical Specifications
- Bill of Materials and Cost Estimates
MECHANICAL PERMIT
This is required before the installation of new or additional, removal or alteration of machinery of at least 20 HP. For new buildings, this forms part of the requirements for a Building Permit application.
Requirements:
- Mechanical Permit Application Form signed by a professional Mechanical Engineer.
- Mechanical Plans
- Mechanical Specifications
- Bill of Materials and Cost Estimates
SANITARY/PLUMBING PERMIT
This document is required before the construction of new or additional, or alteration of existing plumbing installations, water supply, storm drainage, water purification and sewerage treatment plants. For new buildings, this forms part of the requirements for a Building Permit application.
Requirements:
- Sanitary/Plumbing Permit Application Form signed by a Sanitary or Master Plumber
- Sanitary/Plumbing Plans
- Sanitary/Plumbing Specifications
- Bill of Materials and Cost Estimates
FENCING PERMIT
This is secured prior to actual construction of a fence.
Requirements:
- Fencing Permit Application Form
- Fencing Plan
- Bill of Materials and Cost Estimates
- Lot Plan with Certification of a Geodetic Engineer that the proposed fence will not encroach on adjoining properties
- Transfer Certificate of Title (TCT)
- Deed of Sale/Lease Contract/Contract to Sell (if the TCT is not in the name of the owner/applicant)
- Updated Real Property Tax Declaration
- Certificate of Real Property Tax Payment
DEMOLITION PERMIT
This permit is secured prior to the systematic dismantling or destruction of a building or structure in whole or in part.
Requirements:
- Demolition Permit Form
- Sketch plan of area to be demolished
- Certificate of Real Property Tax Payment
TEMPORARY SERVICE CONNECTION PERMIT
This permit is secured for temporary service connection to a power utility for lighting and power construction, Christmas decorative lighting, lighting of cemeteries, temporary lighting for carnivals/fiestas, testing, etc.
Requirements:
- Permit Form (DPWH Form No. 96-005-E)
- Building Permit (for new construction)
- Electrical Plan/Layout
- Fire Safety Inspection Certificate (FSIC)
EXCAVATION AND GROUND PREPARATION PERMIT
This permit is secured prior to actual ground preparation and excavation after the building line is established.
Requirements:
- Accomplished Permit Form (MPW Form No. 77-014-B)
- For MNWD connection purposes, present Accomplished MNWD Application Form
SIDEWALK CONSTRUCTION PERMIT
This permit is secured prior to the construction and repair of sidewalks.
Requirements:
- Accomplished Permit Form (MPW Form No. 77-015-B)
- Sketch plan of sidewalk to be constructed/repaired
SCAFFOLDING PERMIT
This permit is secured whenever the erection of scaffolding occupies street lines.
Requirements:
- Accomplished Permit Form (MPW Form No. 77-017-B)
- Sketch plan of street line to be occupied
SIGN PERMIT
This permit is secured prior to the installation, erection, attachment, painting of any form of signages.
Requirements:
-
- Sign Permit Form
- Building Permit Form whenever there is a concrete/steel structure.
- Structural Analysis
- Zoning Clearance
- Permit Form (DPWH Form No. 96-001-E) whenever there is an electrical connection
- Fire Clearance whenever there is an electrical connection
- Sketch plan of signage/s to be installed/erected.
- Location/vicinity plan
- Lot documents whenever it occupies a private lot
- DPWH clearance (for national roads/highways)
HOW TO AVAIL THE SERVICE
|
Secure Application Forms
Client asks for the particular permit form applied for from any member of the Building Staff.
|
5 minutes
|
RODERIC R. BOMEDIANO Engineer I
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Submit Requirements
Client submits the duly accomplished application form and documents
|
5 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Evaluation and Assessment
The ME staff evaluates and assesses the submitted plans and pertinent documents for compliance with the requirements of the building code, referral codes, laws and ordinances.
|
15 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
RODERIC R. BOMEDIANO Engineer I
|
|
Make a Follow-up
Client makes a follow up to inquire the status of the application.
|
After 1 day
|
ALEXANDER P. DOLAUTA Municipal Engineer
RODERIC R. BOMEDIANO Engineer I
|
|
Order of Payment
If the documents are in order, the applicant receives an Order of Payment stating the fees to be paid.
|
10 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
RODERIC R. BOMEDIANO
Engineer I
|
|
Payment of Fees
Client pays to the Municipal Treasurer’s Office |
5 minutes |
Beda Legaspi Revenue Collection Clerk I1
Rufa acuñA
Revenue Collection Clerk II
|
|
Submit Official Receipt
Client submits the official receipt to the staff in charge of receiving.
|
10 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|
Processing of Permit
Building staff processes the plans and pertinent documents for final approval of the building official.
|
1 day
|
ALEXANDER P. DOLAUTA Municipal Engineer
RODERIC R. BOMEDIANO Engineer I
|
|
Release of Permit
Client receives the approved permit.
|
10 minutes
|
ALEXANDER P. DOLAUTA Municipal Engineer
|
|